A full set of fully tiled steps are manufactured right into the pool.
|
Ceramic tile depth markers are added to meet code.
|
|
Loading the spa and pool sections took Bradford just under three hours to complete.
|
A crane easily hoisted all sections onto two waiting trucks.
|
  |
|
Truck arrives at job site in Philadelphia, PA.
|
Crane is waiting to hoist spa and pool sections to 4th floor of new hotel construction.
|
|
With drawings provided by Bradford, construction crew was able to pre-fab and pre-pour entire pool pit, including
cantilever top decking.
|
Unloading, setting in place and leveling took just 6 hours.
|
  |
|
The spa is set onto the lip of the pool. Notice the three waterfalls spilling from the spa to the pool.
|
Completed pool is enhanced by underwater illumination.
|
  |